Vaccine mandate needs novovax approval or extension of timeline from my ### dept...

Anonymous

Beloved of All
Vaccine mandate needs ### approval or extension of timeline from my HR dept... For those who don't know, my restaurant is very short staffed. We will be losing people due to a Mandatory Vaccine Requirement by ###, 14 days from now. Please pray the traditional, safe & effective vaccine from ### is approved in the U.S. and world ASAP and for wisdom for what to do -- perhaps they can give us time as we see some approvals from around the world. It doesn't make the human cells produce an impotent spike like the MRNA vaccines~###, ###~and it doesn't cause Neurological damage like ###. It doesn't enlarge the heart, give hearing loss or make you sterile like the other vaccines. It doesn't need to be kept at -### or -### below zero or use fetal cells. Search "### confidence" to see they are geared up to produce ### million doses a month worldwide. Thank you in Jesus name

 
Praying with and for you in Jesus.

We can do everything Jesus did and more! We can speak; sickness leave in Jesus! Be healed by Jesus stripes! I am healed by Jesus stripes! Amen! Thank You Lord Jesus!

You can copy and paste this to pray every day and share...

There is nothing that happens for us that is bad. All things work for our good in Jesus! Look at everything as good!

Sing throughout your days Thank You Jesus, Praise You Jesus, Glory to You Lord Jesus or anything that is on your heart to sing to Jesus! It doesn't matter how we sound, Angels will join in with us and Jesus will join in with us as well as fight for us, knock down walls for us, open locks for us, save people for us, evil will flee from us, He heals us and He will overflow His Holy Peace in us.

Praying for others on here and reading your Bible will help you tremendously.

I wanted to commit suicide once, I even came up with a plan. Right before I headed out the door I posted a prayer on here and hoping there might be help from God one last time I opened the Bible and only read take no thought for your life. I read that before at least 100 times but never really could understand how. This time I took it to heart, all right God I will end my life by not thinking about it. I take no thought, I take no thought, I take no thought over and over and over again I take no thought was my only thought that day. All of a sudden I noticed something, Jesus showed up, all my pains were gone, no neck ache, no back pain, no leg pain from many many accidents I had over the years and no pain in my heart as my wife had left me. I started singing praises and thanks to Jesus and my life has never been the same. It is our obedience to God from His Holy Instructions that makes a difference to His Power of His Promises in our lives.

Be a doer of Jesus friend, it really makes a difference! Thank You Lord Jesus!

Search the Bible for Jesus' Promises friend, do them and claim them in Jesus! Amen! Thank You Lord Jesus!

Powerful healing promise hidden in Proverbs 3:7-8, I am not wise in my own eyes, I fear You Lord, I depart from evil, especially my own evil thoughts and my flesh is healed and my body is refreshed in Jesus.

Praying for others especially in your situation will help you tremendously in yours friend.

Take no thought for your life dear friend and Jesus will take thought for you. Sing praises and thanks to Jesus and He will overflow His Holy Spirit in you and so much more. He will fight for you and give you the desires of your heart.

Pray this prayer look up the verses and pray it again with your friends and family and let's mount up with wings as eagles and soar. Soar with me.

Let Us Pray: God I ask in Jesus' name, bless me to grow closer to You. I long for a more intimate relationship with You. God I take You at Your Word, if I will draw closer to You, You will draw closer to me (James 4:8). Show me how to draw closer to You. Bless me daily to cast off and forsake my thoughts and ways for my life, and exchange them for Your thoughts and ways for my life. Let me think Your thoughts and dream Your dreams for my life. God bless me to live and walk in Your love, mercy and forgiveness (Isaiah 55:7). I confess, I will take no thought for my life. I will trust You Father God to take thought for me and take care of me (Matthew 6:25-34). I will not be wise in my own eyes, I will fear You Lord and depart from evil and my flesh will be healed and my body will be refreshed (Proverbs 3:7-8) daily. Thank You Jesus for Your Promises! Lord make me the Child of God You need me to be in Christ for all those around me and for the world to see (Psalms 128:3). Not by my might, nor by my power, but by Your Spirit Christ Jesus (Zechariah 4:6) this shall happen. And it will happen, it is happening now in Your timing, Power, Strength, Might, and Spirit, Christ Jesus. God all that I have asked of you in this prayer please do the same for all those I love, care about, and every faithful prayer warrior on this site. Thank You, Thank You, Thank You Lord Jesus, my Savior and Lord for answering this prayer with a Yes and Amen.

Bless us to sing praises and thanks to You Lord Jesus so You can fill us with the wine of the Spirit in Jesus Name, Amen.
 
I have prayed that God will answer your prayer request according to God's perfect love, wisdom, will, timing, grace, and mercy in Jesus' name. Amen.

A Prayer For You: God I ask You in Jesus' name bless me with the desires of my heart that is the will of God for my life and the lives of those I pray for. God heal me totally in all areas of my life. Make me whole in You. Bless me to prosper, walk in excellent health, and never stop growing in the grace and knowledge of Christ Jesus. Bless me with a deep and abiding love to read, study, listen to, and meditate upon Your Word. God let Your Word dwell within me richly. So that I may come to know You better, love You more, and make You known. God help me, show me how, and bless me to have an ever-growing closer, stronger, more intimate relationship with You. God bless me with and cause me to always think, act, and react with a God solution-focused heart, mind, attitude, and spirit. God help me and bless me to walk in the faith, hope, and love of Your Word and presence in my life. God place Your angels all around me to cover and protect me from all sickness, evil, hurt, harm, danger, accidents, the plans of my enemies, and the plans of the enemy of my soul. God deal with all my enemies according to Your Word. God all that I have asked of You in this prayer, please do the same for the writer of this prayer, all those I love and care about, and all those who love and care about me. And God please bless each of us to always walk in the integrity, love, character, and habits of Christ Jesus. Let us all live our lives for Your glory God. God please forever honor this prayer over each of our lives. Amen, so be it by faith, and by faith, it is so. God Thank You and Thank You for loving me. Prayer written by Encourager ###, M.A., Board Certified Professional Christian Life Coach

How to have An Intimate Relationship With God-Your Strength Lies In Your Intimacy with God
 

Latest Activity (auto refresh)

Loading…

Similar Requests

Vaccine Mandate needs Novovax Approval or Extension of Timeline from my Work... For those who don't know, my restaurant is very short staffed. We will be losing people due to a Mandatory Vaccine Requirement by ###, 14 days from now. Please pray the traditional, safe & effective vaccine from...
Replies
9
Views
278
Vaccine mandate and staying employed: wisdom, favor and etc, all vaccines ok'd mediocre or less than average compared to Novovax... I ask for wisdom on what to do about the vaccine I am being forced to take by Saturday. Novovax has been submitting requests for emergency use in many countries...
Replies
11
Views
310
Your donations for running this web site are greatly appreciated.

Click To Make A Donation

Forum statistics

Threads
2,097,001
Messages
16,840,883
Members
652,238
Latest member
Kaylael

Latest Blogs & Articles

Back
Top Bottom